Project BMW TKB München

The chilled water and heating systems consist of durable PP pipes, joined using electrofusion sockets to ensure maximum safety and longevity. The glycol system was efficiently installed using the flexible Victaulic system. For ventilation, galvanized ducts and spiral-seam pipes were used, ensuring optimal airflow and functionality.

Klinika Munich

As part of the project for the University Hospital of Munich at Sanatoriumsplatz, RK Wasserkraft GmbH carried out the complete installation of heating, cooling, and ventilation systems, including the assembly and connection of air handling units (AHUs) and climate control centers. The implemented systems meet the highest standards for energy efficiency, operational safety, and reliability, and have been specifically tailored to the requirements of a modern medical facility.

Hamburg - Office Building

The scope of work included the implementation of a complete cooling system – from prefabrication and installation of the central system through to the connection to the ventilation units. During execution, a cooling installation made of steel piping was carried out, with all joints executed using welded connections.

Daimler-Mercedes construction site Sindelfingen

At the Daimler-Mercedes construction site in Sindelfingen, we implemented a high-performance heating and cooling system based on horizontally welded black steel pipes. This design ensures not only maximum stability and durability, but also efficient heat and cooling distribution throughout the entire building.